Retirement Home Logatec – Slovenia

Project statistics

Annual savings:

6,000

EUR

Situation before the contract and client requirements

The client was using natural gas as the energy source for heating the building, requiring 764 MWh annually. 

The client wanted the lowest price of thermal energy.

Resalta solution

The analysis of the current heating energy demand and the integration of an appropriately-sized cogeneration of heat and power (CHP) unit on natural gas. 

Resalta installed a CHP unit with an electric power capacity of 50 kW and a thermal power capacity of 80 kW. 

Resalta is operating and maintaining the plant, monitoring the system through Resalta‘s central control system (web access) in real time and selling heat and electricity to the client. 

Chcesz zobaczyć więcej?

Pobierz nasze badania

Regulamin

Zapisując się na naszego newslettera zgadzasz się na otrzymywanie wiadomości e-mail od Resalty Luneos Sp. z o. o. Celem naszego newslettera jest informowanie o działalności Resalta Luneos, nowych projektach, postępach, nadchodzących wydarzeniach oraz przekazywanie najświeższych doniesień dotyczących wydajności energetycznej i odnawialnych źródeł energii gościom odwiedzającym naszą stronę internetową, partnerom, klientom oraz opinii publicznej. Nasz newsletter będzie wydawany najczęściej raz w miesiącu, z wyjątkiem nieplanowanych, lecz ważnych wiadomości. Zastrzegamy sobie pełne prawo do modyfikacji lub zaprzestania publikowania newslettera, w każdym momencie bez powiadomienia. Traktujemy Twoją prywatność poważnie i nigdy nie przekażemy lub nie sprzedamy Twoich danych osobom trzecim. W każdej chwili możesz zrezygnować z subskrypcji newslettera.