Novigrad Municipality – Croatia

Project statistics

yearly reduction in energy use

307,411

kWh

Annual savings

35,600

EUR

115.5

t

annual reduction of CO2 emissions

Situation before the contract and client requirements

The municipality of Novigrad in Istria announced a public tender for the renovation of all their public lighting according to the ESCO model.

One of the key requirements was to preserve the unique architectural appearance of the city, for the luminaires to match the style of the town.

Resalta solution

Replacement of 954 luminaires with 860 LED luminaires.
The old luminaires had an installed capacity from 70 to 400 W,

Resalta replaced them with more energy efficient luminaires ranging from 19 to 109 W.

The contract duration is 7.5 years. A year into the contract, the savings made by Novigrad already exceeded expectations and initial calculations. 

Chcesz zobaczyć więcej?

Pobierz nasze badania

Regulamin

Zapisując się na naszego newslettera zgadzasz się na otrzymywanie wiadomości e-mail od Resalty Luneos Sp. z o. o. Celem naszego newslettera jest informowanie o działalności Resalta Luneos, nowych projektach, postępach, nadchodzących wydarzeniach oraz przekazywanie najświeższych doniesień dotyczących wydajności energetycznej i odnawialnych źródeł energii gościom odwiedzającym naszą stronę internetową, partnerom, klientom oraz opinii publicznej. Nasz newsletter będzie wydawany najczęściej raz w miesiącu, z wyjątkiem nieplanowanych, lecz ważnych wiadomości. Zastrzegamy sobie pełne prawo do modyfikacji lub zaprzestania publikowania newslettera, w każdym momencie bez powiadomienia. Traktujemy Twoją prywatność poważnie i nigdy nie przekażemy lub nie sprzedamy Twoich danych osobom trzecim. W każdej chwili możesz zrezygnować z subskrypcji newslettera.